Load Monitoring
If you are planning to add significant electrical demand to your installation, or investigating unexplained trips and failures, load monitoring gives you accurate data on what your system is actually doing. We install monitoring equipment across your key circuits and distribution boards and record continuous data over an agreed period, typically one to two weeks.
What our monitoring includes
FAQs
Straight answers to the most common questions about fixed wire testing for commercial properties.
Is load monitoring disruptive?
No. Monitoring equipment is clamped onto existing conductors and records passively. Your systems continue to operate normally throughout.
How long does monitoring take?
Typically one to two weeks, long enough to capture a full working cycle and any regular peak demand periods.
What does the report tell me?
It shows how your installation performs under actual operating conditions: peak demand, average load, phase balance, power factor, and any power quality issues. Where constraints are identified, we explain what they mean and what can be done.
Can monitoring confirm whether we have capacity for EV charging?
Yes. This is one of the most common reasons we carry out load monitoring. The data tells you whether your existing supply and distribution infrastructure can support the additional demand, and if not, what needs to change.
Case Studies
Electrical Survey for Heat Pump Installation
Historic building
EICR
St Paul’s Catholic School, London
Our accreditations
We're proud to hold several important certifications that demonstrate our commitment to quality and safety. Every accreditation is independently verified and kept current.

