St Paul’s Catholic School needed its EICR renewed. They had the old certificates and documentation from the previous test, and they contacted Prolec expecting a straightforward job.
Before mobilising, we reviewed the existing documentation in detail – mapping every listed board and circuit into a clean reference pack for the engineers on site. That preparation revealed the first sign that the job was not what it appeared to be.
The Challenge
The school had a fixed deadline: all work needed to be completed within the holiday window to avoid disruption during term time. Completing only the quoted circuits would have left untested distribution boards in the building – boards that, if found by an insurer or auditor, would represent a clear electrical compliance gap.
Our Approach
The Documentation
Gallery